Work to replace the emergency section of a 35-meter pipeline with a diameter of 300 mm on the street. Teaching, Novosibirsk. The work was carried out at a temperature of -35 degrees.
Trenchless replacement of a reinforced concrete pipe 500mm with 500mm SDR 17 polyethylene pipe by destruction method.
Presentation. Demonstration work for “Georgian Water and Power” (GWP) for the replacement of the emergency sewerage in the busy section of Rafael Agladze Street. The pipeline was successfully replaced with a length of 14 meters and a diameter of 225 mm in 1.5 hours.
Replacement of the output in an apartment building with an increase in diameter from 160 mm to 225 mm.
Replacement of worn-out water drainage systems on the territory of the Kremlin, Moscow, 1998.
Replacement of 1400 mm steel pipes with 1200 mm ones, Novosibirsk
Driving a 1400mm steel pipe, St. Petersburg
Formation of cast-in-place piles
Installation of an inclined well to replace a 225 mm water supply pipe